RV Trailer Decking

Adding some strength to the trailer frame.

Several pieces of angle were cut to be welded on to the frame to allow the attachment of the deck and wood frame (for the cabin).



915A12C3-894E-47CD-9F8D-BA55DADE07EF_1_105_c

9FF32ECE-1B63-4FC2-B133-B256C0050E11_1_105_c

Rough fitting test of the first piece of 20awg steel sheet:

C5AC7BB5-3D99-46F1-B972-DB3D5226E263_1_105_c

EF02CEC6-6595-45F6-A60F-9C41CA93C169_1_105_c

Tacked in place:

9A3E91F4-BE61-40D7-86EE-9ABA9351C2F1_1_105_c
C5C93CD6-A8A0-421E-9C0A-1BC783B37F7A_1_105_c


E4A627BE-C8BC-4F01-AB63-E1235E10521B_1_105_c

652C7A46-BE07-4DCD-9E74-07556B049A27_1_105_c

DD31B0A5-7A85-4447-8A85-AF3DEC83A615_1_105_c

D6861615-E82E-444D-BB07-F9416D06B542_1_105_c

RV Trailer leveling jacks

RV Trailer leveling jacksAdding leveling jacks to the RV trailer frame.


These are simple scissor jacks that were procured from Harbor Freight.
2.5t scissor jack: 
https://www.harborfreight.com/2-1-2-half-ton-trailer-stabilizer-jack-96406.html

C6C3455E-2761-44A0-9B04-8F87ECECDF76_1_105_c

Using some 2″ angle, a suitable attachment was made for the jack.

0C93A2AD-2E8E-4F3F-853B-3B07CFCE013D_1_105_c
One side complete. Now to make a bracket for the other side.
F6293477-EAA0-4515-91D2-233B1217DD64_1_105_c
Testing out the jacks.
The jacks were attached to the frame using some bolts so that they can be replaced if needed. Since there was more welding to be completed on the frame, the jacks were used to lift and level the frame for the next bit of the construction.

56917F4B-5A77-4108-AD88-1B03AC474286_1_105_c
Leveling the whole frame for some more welding.

RV Trailer A-frame construction

Some more cutting of the stock steel, and then some welding, and voila, an a-frame!

9042744D-858C-422A-BC1F-07DA38A3E953_1_105_c

Cutting the stock to form the a-frame


9767F890-7CDA-45EF-9F88-1A2910518A93_1_105_c

With the c-channel in place, time to weld it together.

2537FE13-BD66-4D8B-95C4-26BCF3564F26_1_105_c

Flip the frame over and weld the other side.
The trailer frame starting to take shape.

BAF62084-A572-400C-B332-9126B07E1D88_1_105_c

The a-frame welded in place

Receiver bolted on to the frame.

F40DD6B0-6E5D-43D8-80D8-11601E76F6F7_1_105_c

Getting ready for the addition of the axle and the wheels.